One Stop Solution Manufacturer for all kind of Stamping Products and CNC lathed products.
If you have some concepts about the mold, you probably understand that a set of molds must go through the evaluation of the drawing, the confirmation of the model, the design of the mold, the processing and assembly of the mold, and the success of the trial mold. And how much work does each step have for shield manufacturers? With normal drawing evaluation, the stamping group can be completed within two hours. Then there is the model time. The scale and experience of sub-shield manufacturers are relatively different at different times. I remember one time when I was able to communicate with a customer for two days, the customer’s eyes were full of surprise and he didn't believe it. Two days after the sample was handed in, I immediately agreed with Brother Qun. The mold drawing design of the shielding cover can be completed in four hours. That is to say, including the drawing design, including material preparation, the heat treatment process can be sent to the normal day. The normal wire cutting of the template is also the template of a shielding cover mold for about ten hours or so. 7-8 sets of templates, several wire cutting machines, the efficiency is also different. The assembly part has a lot to do with the master. A skilled master can install a set of molds in one day. If you have more needs or industry questions about the shielding cover, you are welcome to connect with Qunge:
Contact Person: Steven Yan
Whatsapp: +86 15916928704
Wechat: CITY-STOP
Phone: +0086 159 1692 8704
E-MAIL: ym@syjwj.com.cn
One-stop manufacturer for all kind of stamping products and CNC lathed products.