One Stop Solution Manufacturer for all kind of Stamping Products and CNC lathed products.
In the production work, we all know that we should pay attention to ensuring the safety of the entire construction process. So, in actual work, in order to ensure that we complete the work smoothly, how should safety management be done for scaffold stamping parts? I don’t know if you have considered this issue. If you are interested in this, you might as well take a look at the relevant content with us. First of all, it is the transportation link for scaffolding stampings. Under normal circumstances, in order to ensure the normal use of accessories, we must also properly manage the transportation of materials. For example, if it is a frame-type scaffolding, it is best not to use a trolley. When the material is transported horizontally, it is best to use the floor slab or with the help of a tower crane to transport it to the appropriate location. When using scaffolding stampings, the staff must do the corresponding inspection work. Under normal circumstances, when the main structure is being constructed, it should be checked every three days; when the main structure is completed, it needs to be checked at least one day every seven days. The contents of each inspection are: whether each connecting rod is deformed, whether the connecting point is loose, whether the connection is reliable, etc. In short, only after a comprehensive inspection can we better ensure the safety of use. When the scaffolding needs to be dismantled after the completion of the project, we should proceed in the order from top to bottom. However, it should be noted that the order of removal of components is reversed. In addition, the dismantled scaffold stamping parts must not be thrown directly from above. It is best to bundle the dismantled parts first, and then transport them to the ground by special tools, and place them together for safekeeping. In short, we must not underestimate the work of safety management. We hope that through the introduction of the above content, everyone can fully understand the requirements of scaffolding stamping parts. In the future work, we hope that we can do this work well. Related news: The characteristics of the main materials of stamping parts, the handling of common problems of stamping parts, the characteristics of scaffolding stamping parts and the importance of inspections
Contact Person: Steven Yan
Whatsapp: +86 15916928704
Wechat: CITY-STOP
Phone: +0086 159 1692 8704
E-MAIL: ym@syjwj.com.cn
One-stop manufacturer for all kind of stamping products and CNC lathed products.