One Stop Solution Manufacturer for all kind of Stamping Products and CNC lathed products.
1. Installation of woodworking hardware items:
Most wood products need to consider the issue of paint. Therefore, the installation time of the hardware needs to consider the connection with the painter's construction. This needs to be considered from two aspects:
First, the installation time of the hardware cannot be arranged too early, otherwise, the painter will need to consider the protection of the hardware too much during the construction;
Second, when installing hardware, pay attention not to damage the work done by the painter.
Therefore, the normal construction is often arranged like this: For the hardware that needs to be drilled, it is basically completed before the painter’s construction or the main process (such as the unlocking hole before the door lock is installed) It is carried out at this stage, and the drilling of the handle is best arranged at this stage). After the painter finishes the construction, the carpenter will carry out the installation work.
2. Installation of electrician lamps and switch socket panels:
The installation of lamps and switch socket panels should be carried out after the painting or wallpapering of the wall is completed. There has been such an example: in order to save personnel expenses during construction, a company arranged for the electrician to install the switch socket prematurely. As a result, the painter behind did not pay attention to protecting the switch socket and cut it with a wallpaper knife When opening and closing the opening of the socket panel, the panel was accidentally scratched.
3. Installation of sanitary ware and bathroom hardware:
Because our current overall management level in the home improvement industry is still very low, the quality of the workers on the construction site is generally poor. Therefore, in some construction sites, too many installed bathtubs were first used by construction workers. In recent years, there have been many complaints in this regard. Therefore, unless it is unavoidable, it is best not to install sanitary ware before the acceptance of the project and most construction workers have not left the site. Otherwise, it is very likely that you will find hair left after bathing in your brand new bathtub.
Contact Person: Steven Yan
Whatsapp: +86 15916928704
Wechat: CITY-STOP
Phone: +0086 159 1692 8704
E-MAIL: ym@syjwj.com.cn
One-stop manufacturer for all kind of stamping products and CNC lathed products.