One Stop Solution Manufacturer for all kind of Stamping Products and CNC lathed products.
The general sequence of metal stamping die installation (refers to the metal stamping die with guide pillar guide): ①Adjust the height of the press slider according to the closed height of the die, so that the slider is at the bottom dead center between its bottom plane and the working table. The distance is greater than the closing height of the die. ②First raise the slider to the top dead center, place the die at the specified position on the working table of the press, and then stop the slider at the bottom dead center, and then adjust the height of the slider so that the bottom plane is in contact with the upper plane of the die seat. For the die with a die handle, the die handle should be inserted into the die handle hole, and the die handle should be fixed by the pressing block and the screw on the slider. For a large die without a die handle, the upper die base is generally fastened to the press slider with screws, and the lower die base is preliminarily fixed on the press table (without tightening the screws). ③Adjust the slide block of the press by 3~5mm, start the press, idle stroke 1~2 times, stop the slide block at the bottom dead center, and fix the lower die seat. ④ Carry out a test punch, and gradually adjust the slider to the required height. If the upper die has an ejector pin, the discharge bolt on the press should be adjusted to the required height. Previous post: No more
Contact Person: Steven Yan
Whatsapp: +86 15916928704
Wechat: CITY-STOP
Phone: +0086 159 1692 8704
E-MAIL: ym@syjwj.com.cn
One-stop manufacturer for all kind of stamping products and CNC lathed products.