The product features easy installation, as it does not require flash mixers, chemical pre-feed equipment, and filter basins. It is pre-coated with anti-corrosion lubricant
metal stamping china
SPECIFICATIONS
MOQ
10K
Payment
T/T, L/C, Paypal
Place of Origin
DongGuan,GuangDong
Delivery Time
3-6 days for sample,7-15 days for mass production
Its raw materials all comply with the international RoHS standard. It is guaranteed with a high-temperature resistance performance. The product is easy to clean thanks to its smooth surface.
we welcome custom designs and ideas and is able to cater to the specific requirements. for more information, please visit the website or contact us directly with questions or inquiries.