In our factory, we adopt the most stringent set of quality management system.
metal stamping china
SPECIFICATIONS
MOQ
10K
Payment
T/T, L/C, Paypal
Place of Origin
DongGuan,GuangDong
Delivery Time
3-6 days for sample,7-15 days for mass production
It is widely used because of better cast property and higher mechanical performance. After the surface being treated, the product has a glossy surface. The product is not easy to crack even under the high temperature.
we welcome custom designs and ideas and is able to cater to the specific requirements. for more information, please visit the website or contact us directly with questions or inquiries.